As part of a project in Nigeria, one of the French leaders of Oil & Gas industry awarded TEKFLOW for the manufacturing of the handling heads.
The main objective of this project in Nigeria is the use of flexible pipes as a cost saving alternative to carbon steel pipeline installation for gas, oil, and water infrastructure expansion.
A total of 10 handling heads (8 off 4in and 2 off 6in) have been delivered on short lead time basis, less than 7 weeks from the KOM to the release, including the forging of ASTM A694 F65 material, in-house machining and F.A.T, and painting.
Tekflow is proud to show results in progress.